Adjoining the Scitor building (now Booz Allen Hamilton building) is a 428 stall, 2-story structured parking facility.

 

Costs of this structure were kept at a minimum by designing grade accessible entry at both levels thus eliminating all ramping.

 

Scitor was the first building within the 65 acre Patriot Park Defense Campus near Peterson AFB. Bryan Construction performed all master plan infrastructure work to include interior roadway arteries, all surface parking lots, utility main lines, stubs to future lots, storm water retention area and the redevelopment of Sand Creek requiring several riprap stone & concrete drop structures.