SRM Utility Boiler Project at Fort Carson

Project Description

This project required the removal of an existing utility boiler, and its replacement by a new high-temperature boiler with a 40,000,000 BTU/hr. output. Asbestos and lead abatement needed to be performed, and eventually, Bryan Construction added a plant-wide control system.

Client

US Army Corps of Engineers Omaha District

Location

Fort Carson, Colorado

Category

industrial / manufacturing