B-21 Washrack and Maintenance Hangar project includes:
- 56,811 square feet of hangar space
The project is being constructed adjacent to – and is required to integrate with – active airfield operations. Demolition of existing facilities, utilities, and infrastructure – including hazardous materials, contaminated hangars, apron, and soils. Site features include associated airfield apron, site features, utilities, and infrastructure for future B-21 projects.