Birthing Center
Expecting moms need a comfortable place to stay. The three-phase remodel of the birthing center at Memorial Hospital included demolition, refurbishing 11 patient rooms, and reconstruction of 2 nurse’s stations. Bryan Construction completed construction while patients were being treated, requiring special coordination and attention.
Parking Garage
Innovative design is the highlight of the 552,000-square-foot parking garage constructed for Memorial Hospital. Brick inserts in precast concrete panel make up the seven-level facility with a new entryway and four elevators. Bryan Construction worked through unique conditions to provide a long-lasting parking solution for the hospital.
Grease Interceptor
With the same precision and coordination of the surgeon saving lives upstairs, Bryan Construction replaced existing sanitary sewer lines and grease interceptors located in the basement level of the main hospital building. A ten-phase project, the majority of the work was underground. The capable team completed the complex installation without major disturbances to hospital operations.
Birthing Center
Expecting moms need a comfortable place to stay. The three-phase remodel of the birthing center at Memorial Hospital included demolition, refurbishing 11 patient rooms, and reconstruction of 2 nurse’s stations. Bryan Construction completed construction while patients were being treated, requiring special coordination and attention.
Parking Garage
Innovative design is the highlight of the 552,000-square-foot parking garage constructed for Memorial Hospital. Brick inserts in precast concrete panel make up the seven-level facility with a new entryway and four elevators. Bryan Construction worked through unique conditions to provide a long-lasting parking solution for the hospital.
Grease Interceptor
With the same precision and coordination of the surgeon saving lives upstairs, Bryan Construction replaced existing sanitary sewer lines and grease interceptors located in the basement level of the main hospital building. A ten-phase project, the majority of the work was underground. The capable team completed the complex installation without major disturbances to hospital operations.
TOUR Memorial Hospital
Share this Project
RELATED PROJECTS
All Rights Reserved
5475 Tech Center Drive, Suite 300
Colorado Springs, CO 80919
(719) 632-5355
7807 East Peakview Ave., Suite 150
Centennial, CO 80111
(720) 974-2557
4700 Innovation Drive, Building C
Fort Collins, CO 80525
(970) 377-0937
Şerifali Mahallesi
Yűkseliş Sokak No. 10
Ümraniye
Istanbul, Turkey
+90-212-446-2858, ext. 119