
Performance Dental
Performance Dental contracted Bryan Construction to renovate 1,700 square feet of existing office into a new dental office. Located within the up-and-coming North East part of Boulder, construction utilized modern interior finishes and a high-end architecture design. Construction included four new exam rooms, a mechanical lab, prep lab, break room, waiting room, and reception area. Bryan Construction also installed compressed air and vacuum piping. We completed the work in a condensed six-week schedule.
Performance Dental contracted Bryan Construction to renovate 1,700 square feet of existing office into a new dental office. Located within the up-and-coming North East part of Boulder, construction utilized modern interior finishes and a high-end architecture design. Construction included four new exam rooms, a mechanical lab, prep lab, break room, waiting room, and reception area. Bryan Construction also installed compressed air and vacuum piping. We completed the work in a condensed six-week schedule.
TOUR Performance Dental
Share this Project
RELATED PROJECTS
The Commons
- Healthcare, Multi-Family
Elite Body Sculpture
- Healthcare, Office
Pueblo Community Health Center’s East Side Clinic
- Healthcare
St. Francis Medical Campus
- Healthcare, Office
Children’s Medical Center
- Healthcare, Renovations/Interiors

All Rights Reserved
SOUTHERN COLORADO
5475 Tech Center Drive, Suite 300
Colorado Springs, CO 80919
(719) 632-5355
CENTRAL COLORADO
7807 East Peakview Ave., Suite 150
Centennial, CO 80111
(720) 974-2557
NORTHERN COLORADO
4700 Innovation Drive, Building C
Fort Collins, CO 80525
(970) 377-0937
INTERNATIONAL
Şerifali Mahallesi
Yűkseliş Sokak No. 10
Ümraniye
Istanbul, Turkey
+90-212-446-2858, ext. 119