With both Colorado Springs and UCCS rapidly expanding, North Nevada Avenue needed revamped infrastructure to support UCCS and city projects. The multi-phased project includes below grade infrastructure covering utility main extensions and above grade work for an entry boulevard, road connection, parking lots, sidewalks, exterior lighting, landscaping, and storm water treatment. During this project, we maintained access to the Eagle Rock neighborhood and the two athletic fields. Now this main artery of Colorado Springs is prepared to support the growth of UCCS along with shopping, entertainment, and medical infrastructure.
With both Colorado Springs and UCCS rapidly expanding, North Nevada Avenue needed revamped infrastructure to support UCCS and city projects. The multi-phased project includes below grade infrastructure covering utility main extensions and above grade work for an entry boulevard, road connection, parking lots, sidewalks, exterior lighting, landscaping, and storm water treatment. During this project, we maintained access to the Eagle Rock neighborhood and the two athletic fields. Now this main artery of Colorado Springs is prepared to support the growth of UCCS along with shopping, entertainment, and medical infrastructure.
TOUR UCCS North Nevada Infrastructure
Share this Project
RELATED PROJECTS
- Civil/Infrastructure, Classified Space, Renovations/Interiors
All Rights Reserved
5475 Tech Center Drive, Suite 300
Colorado Springs, CO 80919
(719) 632-5355
7807 East Peakview Ave., Suite 150
Centennial, CO 80111
(720) 974-2557
4700 Innovation Drive, Building C
Fort Collins, CO 80525
(970) 377-0937
Şerifali Mahallesi
Yűkseliş Sokak No. 10
Ümraniye
Istanbul, Turkey
+90-212-446-2858, ext. 119